亚洲国产精品无码一线岛国,成年人激情网站,性高潮久久久,九九av
中
EN
Home
About Us
Classic Projects
Qualification Certificates
Corporate Culture
Overseas Development
Contact Us
HOME
About Us
Classic Projects
Qualification Certificates
Corporate Culture
Overseas Development
Contact Us
HOME >
News >
ACEG News
ACEG News
Vocation News
ACEG Angolan Branch:Bula-Atomba water supply project completed
ACEG Angolan Branch | Updated: 2020-04-08 | Views: 8960
Bula-Atomba water supply system rehabilitation project – a project under the framework of China loan and has been completed by ACEG Angolan Branch. A grand completion ceremony was held on March, 22
nd
. H.E. Mr. Lucrécio Da Costa, Angolan Secretary of State for Water Resources and Energy, and H.E. Ms Mara Quiosa, Governor of Bengo province, attended the ceremony and delivered their speeches and cut the ribbon for the completion ceremony.
Mr. Lucrécio Da Costa and his delegation inspected some of the key construction sites such as the water intake points and the water treatment station, inquired in details about the operation of the equipments and water supplies. In their speeches, Mr. Lucrécio Da Costa has appreciated the efforts made by ACEG Angolan Branch for the successful completion of the project, and Governor Mara Quiosa thanked ACEG Angolan Branch and all the project participants for their contribution to solving the water supply problems for the local residents.
Bula-Atomba water supply project is located in Bengo province, Angola, and the construction of the project began in March, 2017, the contract amount is USD$9.1653 Million. The construction tasks mainly included water intakes; a reservoir; a water treatment plant and pipeline laying works and so on, after the completion of the project, the water treatment plant will have a daily water supply capacity of 1,320 tons, that the problem of water supply for more than 8000 local households will be solved once and for all.
In addition,
one more thing worth mentioning
is that, in the implementation of the project, hundreds of local people were employed on the project, which has played a positive role in alleviating the local unemployment problems.
H.E. Mr. Lucrécio Da Costa is inspecting the water treatment station
H.E. Ms Mara Quiosa is making her speech at the ceremony
Copyright 2021 By Anhui Construction Engineering Group
Address: Floors 26 - 29, Anjian Mansion International, 459 Huangshan Road, Hefei, China
TEL:+86 551 62865001 62865017 62872714 FAX:+86 551 62865001 62865020 62877722