亚洲国产精品无码一线岛国,成年人激情网站,性高潮久久久,九九av
中
EN
Home
About Us
Classic Projects
Qualification Certificates
Corporate Culture
Overseas Development
Contact Us
HOME
About Us
Classic Projects
Qualification Certificates
Corporate Culture
Overseas Development
Contact Us
HOME >
News >
ACEG News
ACEG News
Vocation News
ACEG Algeria Co. Succeeded in Trial of Using Tunnel Formwork Technology
ACEG Overseas | Updated: 2018-04-03 | Views: 5759
ACEG Algeria Co., Ltd. 1000 Units Housing Project in Darf City, Algeria, has completed the assembly of its first set of tunnel formwork on March 18th, marking the formal launch of the adoption of the new technology for tunnel formwork after a number of experiments.
In order to better adapt to Algerian construction market, ACEG Algeria Co., Ltd. has spared no efforts in adequate market research for higher efficiency with less costs and the new technology for tunnel formwork has achieved the goal, tunnel formwork is adopted instead of the traditional glued template and good effects are seen.
Using tunneling formwork can achieve shorter period of time and better concrete forms and smooth surface – shinning "bare surface" compared with the traditional plywood formwork and it is simple to operate as well with less laboring.
Tunnel Formwork Assembly
Removal of the Shuttering
Shinning "Bard Surface"
Copyright 2021 By Anhui Construction Engineering Group
Address: Floors 26 - 29, Anjian Mansion International, 459 Huangshan Road, Hefei, China
TEL:+86 551 62865001 62865017 62872714 FAX:+86 551 62865001 62865020 62877722